From the A-Basin website pass prices go up October 12th. Has this date been consistent throughout the fall or is it a new deadline? If its new (and I am reading too much into it) I am guessing A-Basin is subtly hinting their optimistic opening date for the 11th or 12th.
and when I use subtly, hinting, and optimistic in the same sentence to describe something my overall confidence level in that assessment is usually low.
and when I use subtly, hinting, and optimistic in the same sentence to describe something my overall confidence level in that assessment is usually low.