A fairly accurate artist's updated Sun Peaks map showing all 4,270 acres:
The Crystal Chair is slated for replacement this summer and the new chair will be realigned to off load near the Burfield Chair at the Top of the World. No word yet as to whether Covid-19 virus will delay chair construction this summer. Some tower bases were built last summer.
The rectangular patch bellow the hike-to Gil's hill (upper right) is a gravity fed reservoir for snow making. A second reservoir for expanded Village drinking water is under construction.
The Orient Ridge Chair (lower right) along with the runs will be extended up the ridge to accommodate future increases in skier visits. Chair will then likely be converted to high speed at that time.
Not all cross country trails are shown.